Paper Title:
The Fast Cooling Measures and Effect Analysis of Precast Box Girders in Passenger Dedicated Lines
  Abstract

The construction of precast box girder plays a pivotal role in the process of building passenger dedicated lines. But the high temperature and low-speed of cooling rate inside the box girder will seriously reduce the box girders’ quality and delay the project duration. So, some methods such as cooling by means of circulating water in drill way etc. are presented in this paper. Then temperature tests are carried out for the box girders with different cooling measures, and the respective data are analyzed. The results show that the proposed cooling methods can effectively reduce the highest temperature, speed up the cooling rate inside the box girder and decrease the temperature difference between the interior and the exterior of the concrete.

  Info
Periodical
Chapter
Chapter 5: Road and Bridge Engineering
Edited by
Paul P. Lin and Chunliang Zhang
Pages
1127-1133
DOI
10.4028/www.scientific.net/AMM.105-107.1127
Citation
X. M. Li, E. Y. Zhu, Y. Z. Zhou, Y. Q. Qi, "The Fast Cooling Measures and Effect Analysis of Precast Box Girders in Passenger Dedicated Lines", Applied Mechanics and Materials, Vols. 105-107, pp. 1127-1133, 2012
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Xue Min Li, Er Yu Zhu, Yong Zheng Zhou, Yue Hong Qin
Abstract:In the process of steam curing to high-speed railway’s simply-supported box girder, there are some problems must be faced such as the...
958
Authors: Shun Bo Zhao, Shi Ming Liu, Xiao Ke Li
Chapter 2: Product Design and Development
Abstract:This paper introduces the design of a prestressed concrete continuous rigid frame bridge with V-shape piers built in Shijiazhuang city,...
821
Authors: Gang Zhang, Cui Juan Wang, Shuan Hai He
Chapter 2: Structural Engineering
Abstract:Being aimed to the earlier temperature crack phenomenon of pier-on mass for concrete box girder during construction caused by hydration....
821
Authors: Xian Lin Yu, Jian Shu Ye, Wen Qing Wu
Chapter 5: Bridge and Road Engineering
Abstract:A FEA program using 8 nodes and 40 freedoms degenerated solid shell element was developed to analyze the spatial stress of long span...
1693
Authors: Xian Wu Hao, Rui Fang Duan, Ji Peng Yang
Chapter 12: Applied Mechanics in General Mechanical Engineering and Construction
Abstract:In recent years, asphalt concrete pavement has been widely used in the deck pavement of highway bridge, the maximum temperature usually...
2855