Analysis and Computation Method of Prestressed Concrete Bridge in Construction Control
  Abstract

Based on solving the problems of pre-camber of the prestressed concrete bridge in construction, the calculation principle of the bridge model constructed in each stage is studied, the relation between forward and backward analysis method is illustrated, and the influencing factors related to characteristics of pre-camber and each controlled point are analyzed. Considering the influencing factors such as the establishment of new elements, the stressing of reinforcement, the shrinkage and creep of concrete in construction, the calculation model is established in accordance with the characteristics of prestressed concrete bridge constructed in each stage. The deformation of each construction segment is calculated with the forward and backward analysis method respectively, so that the pre-camber of each cantilever construction segment is gotten,which is the basis of construction control.

  Info
Periodical
Chapter
Chapter 4: Structural Engineering
Edited by
Paul P. Lin and Chunliang Zhang
Pages
867-875
DOI
10.4028/www.scientific.net/AMM.105-107.867
Citation
S. Tan, Z. W. Yu, H. S. Zhang, "Analysis and Computation Method of Prestressed Concrete Bridge in Construction Control", Applied Mechanics and Materials, Vols. 105-107, pp. 867-875, 2012
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jin Sheng Du, Hai Bin Liu
Abstract:In some long-span prestressed concrete box girder bridges, excessive deflections of main girders are often observed. These unacceptable...
1436
Authors: Jie Jun Wang, Qing Liang Zhu, Xiao Liang Peng
Chapter 9: Bridge Engineering
Abstract:Considering the transformation of the system and the increasing of the load in the construction process of long-span arch bridge, combining...
2273
Authors: Yu Liang He, Yi Qiang Xiang, He Xin Ke, Li Si Liu
Chapter 4: Road and Bridge Engineering
Abstract:Taking the four-span 40m simply supported multi-box steel-concrete composite girder bridge in the ProjectⅡ of Qiushi Expressway in Hangzhou...
1547
Authors: Chun Sheng Wang, Lu Ping Liu, Mao Sen Wei
Abstract:The Yao Zhou downlink Viaduct damaged in a fire accident was repaired using steel plate and concrete composite strengthening (SPCCS)...
145
Authors: Yan Zeng
Chapter 4: Innovation in Bridge and Underground Engineering
Abstract:Static load test was carried out on Hengshui interchange ramp bridge of Lin-Chang expressway. The superstructure of the bridge is...
694