Paper Title:
The Research on the Management of Project Group for Flexibility Based on Fuzzy Comprehensive Evaluation
  Abstract

Project group is characteristic of dynamic uncertainty and higher complexity ,which decides its management methods need to have enough flexibility. Based on the analysis of the flexible influence factors of the project group of management, the paper constructs the project group management flexibility evaluation index system, introduces fuzzy comprehensive evaluation method to the evaluation, and in order to increase its objectivity and feasibility ures the gray correlation analysis method to determine the weights during the process of solving. Finally provides an application example to show that the method is effective and practical.

  Info
Periodical
Chapter
Chapter 8: System Modeling and Simulation
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
4842-4846
DOI
10.4028/www.scientific.net/AMM.121-126.4842
Citation
Y. N. Zhang, Y. H. Cai, "The Research on the Management of Project Group for Flexibility Based on Fuzzy Comprehensive Evaluation", Applied Mechanics and Materials, Vols. 121-126, pp. 4842-4846, 2012
Online since
October 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: De Ling Yang, Wan Ming Chen
Abstract:According to the existing insufficiency of researches of enterprise informatization level evaluation, building an evaluation model of...
823
Authors: Xuan Wang, Yi Xin Wang, Zeng Ke Yang
Abstract:To ensure good operations of BOT project and to prevent the project company's "malicious operation" (overload production, not timely...
6279
Authors: Xue Mei Hou, Lei Yu, Zhi Bo Li, Zhu Ping Du, Bai You Lian
Chapter 2: Measuring and Testing Techniques
Abstract:Nowadays, the parallel system performance evaluation is the hot spot topic. It’s helpful to improve the parallel system performance to...
1202
Authors: Jian Tao Lu, Yan Hui Zhu
Abstract:In this paper, the application of fuzzy mathematics theory to the loader cab man-machine interface analysis and evaluation, preliminary built...
510