A Revised Critical Chain Method and Optimization Model
  Abstract

For product development projects, to void the risk of project delay, all the tasks should be finished as soon as possible. However, the critical chain method (CCM) requires the non-critical tasks to be executed as late as possible. In this paper, the traditional CCM is revised based on the characteristics of product development. Other than the traditional one, the revised CCM is created based on the active plan, that is, all tasks should be executed as early as possible. And then, the schedule scheme of active plan based critical chain method is given, including searching critical chain, no-critical chain and setting buffers. Consulting in the resource constrained project scheduling problem (RCPSP), an optimal model of CCM is built.

  Info
Periodical
Edited by
Kai Cheng, Yongxian Liu, Xipeng Xu and Hualong Xie
Pages
426-430
DOI
10.4028/www.scientific.net/AMM.16-19.426
Citation
W. L. Peng, M. L. Jin, "A Revised Critical Chain Method and Optimization Model", Applied Mechanics and Materials, Vols. 16-19, pp. 426-430, 2009
Online since
October 2009
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Wu Liang Peng, Q.J. Jiao
III. Digital Manufacturing System and Management
Abstract:Critical chain method (CCM) is a new project method which combines project network technologies and management arts. Although there are lots...
541
Authors: Pavel Ceniga, Viera Šukalová
Chapter 1: Logistics and SCM
Abstract:Good management is the process of finding permanent solutions to the dilemma of balance and achieving effectiveness and efficiency,...
13
Authors: Sergei Bovteev, Marina Petrochenko
Chapter 6: Organization and Planning of Construction Works
Abstract:Article presents an assessment of using “Earned Value Management” method for monitoring the construction projects completion on time. It...
1025