Paper Title:
An Improved Artificial Immune Network Algorithm to Solve Multi-Project Scheduling Problem in Product Development
  Abstract

An improved artificial immune network algorithm used to solve multi-mode resource constrained multi-project scheduling problem in product development process is put forward. Firstly, the mathematic model of multi-project scheduling problem is set up. And then, Operations including clonal selection, negative selection and network suppression are used to realize the local searching and global searching which will assure that the algorithm has a powerful searching ability and also avoids the possible combinatorial explosion. Finally, a randomly generated case is used to test its performance and the result shows that the algorithm is effective and efficient.

  Info
Periodical
Edited by
Honghua Tan
Pages
923-928
DOI
10.4028/www.scientific.net/AMM.29-32.923
Citation
T. G. Chen, "An Improved Artificial Immune Network Algorithm to Solve Multi-Project Scheduling Problem in Product Development", Applied Mechanics and Materials, Vols. 29-32, pp. 923-928, 2010
Online since
August 2010
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Li Hong Qiao, C. Wang
Abstract:A scheduling approach using genetic algorithms (GA) was presented to optimize multiple projects for quality project period performance with...
755
Authors: James C. Chen, Wun Hao Jaong, Cheng Ju Sun, Hung Yu Lee, Jenn Sheng Wu, Chung Chao Ku
Abstract:Resource-constrained multi-project scheduling problems (RCMPSP) consider precedence relationship among activities and the capacity...
633
Authors: Xin Li Zhang, Jie Li, Yan Fang Zhu
Chapter 9: Project Management in Building
Abstract:Based on the existing research on multi-project resource allocation, this research presents the triangle relationship diagram about the...
2267
Authors: Zhi Feng Lv, Xiang Dong Ma
Chapter 4: Data Processing and Applied Computational Methods and Algorithms
Abstract:In the multi-project resource conflicts exist in the application of standard genetic algorithm fitness function exist "premature" problem,...
2768