Paper Title:
Production Planning Considering Transfer Lot Size
  Abstract

Traditional methods conduct production planning and scheduling separately and solve transfer lot sizing problem between these two steps. Unfortunately, this may result in infeasibility in planning and scheduling. We take into account transfer lot size in production planning to obtain the consistency and to eliminate the gap between planning and real production. We present the detailed Transfer Lot-Based Model with mixed integer programming. Experiments show that performance measures of a production plan change remarkably with increasing of transfer lot size.

  Info
Periodical
Edited by
Ran Chen
Pages
552-556
DOI
10.4028/www.scientific.net/AMM.44-47.552
Citation
Z. C. Zhang, K. S. Hu, H. Y. Huang, S. Li, "Production Planning Considering Transfer Lot Size", Applied Mechanics and Materials, Vols. 44-47, pp. 552-556, 2011
Online since
December 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Xiao Dong Zhang, Jin Cheng Zhang
Chapter 15: Enterprise Resource Planning and Management System
Abstract:Scheduling the workflow in a dynamic environment is an important issues for actual application because of service resources changed...
1504
Authors: Zhong Hao Zhu, Hong Min Gao
Chapter 11: Hydrology, Coastal and Hydraulic Engineering
Abstract:On the basis of the analysis of the basic information of the river basin reservoirs and application of chaotic ant colony algorithm, the...
1230