Paper Title:
Development of New Type Settlement Plate in Settlement Observation on High-Speed Railway
  Abstract

The stability and smoothness of embankment is very important factors for the design of a new high-speed railway project. To make an accuracy prediction of the post-construction settlement, it is necessary to carry out a carefully settlement observation during the construction of embankment. The defects of traditional settlement plate, however, are well known as disturbing construction and destroyed easily by construction. In this paper, based on the application in Shi-Wu passenger dedicated line, a new type of settlement plate has been developed. The application of this new type of settlement plate in site shows that it has no any disturbs on the pavement and compaction of embankment. And measurement becomes simple and easy to operation. Accordingly, high accuracy of settlement observation can be obtained by this method, which has the value of application in high-speed railway settlement observation.

  Info
Periodical
Edited by
Zhou Mark
Pages
529-532
DOI
10.4028/www.scientific.net/AMM.52-54.529
Citation
H. P. Feng, J. M. Chang, Z. R. Yue, "Development of New Type Settlement Plate in Settlement Observation on High-Speed Railway", Applied Mechanics and Materials, Vols. 52-54, pp. 529-532, 2011
Online since
March 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yun Wei Meng, He Jun Chai
Abstract:Associating with highway widening project of Zhangzhou coastal main artery, the numerical analysis is carried out to analyze the lateral...
3307
Authors: Huai Yu Yuan, Xiao Mou Wang, Wen Jia Song
Chapter 7: Road and Railway Engineering
Abstract:The Hu-Yang expressway, the first one in mountainous area in Shannxi province, has two conflicts in construction. One is the tunnel abandoned...
1499
Authors: Chong Chen
Chapter 6: Buildings and Constructions. Materials and Technologies
Abstract:Abstract: The scheme and implement of dynamic compaction on red sand soil embankment, Ying(tan)-Rui(jin) expressway, is introduced in this...
788