Paper Title:
Analysis and Prediction for Xiaolangdi Reservoir Sand Blocking Operation Period and Water Level of the Lower Yellow River
  Abstract

Xiaolangdi Reservoir undertakes 90% of the Yellow River runoff and 100% of sediment discharge. To ensure the long-term utilization of Xiaolangdi reservoir is the key to prevent the flood in the lower reaches of the Yellow River. Take Luokou Hydrologic Station located in the lower reaches of the Yellow River as an example, conduct an analysis from the aspects of sediment retaining of Xiaolangdi Reservoir, scouring and deposition condition of river channel in the lower reaches of the Yellow River, water level performance for years of different flow of ten times’ water-sediment regulation, predict on the sand blocking operation period of Xiaolangdi Reservoir, water level of specific flow of river channel in the lower reaches of the Yellow River and scouring and deposition condition of river channel, which has played a reference role for the flood control in the lower reaches of the Yellow River.

  Info
Periodical
Chapter
Chapter 3: Frontiers of Civil Engineering
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
1318-1323
DOI
10.4028/www.scientific.net/AMM.71-78.1318
Citation
Q. A. Li, H. D. Liu, Y. K. Zhao, "Analysis and Prediction for Xiaolangdi Reservoir Sand Blocking Operation Period and Water Level of the Lower Yellow River", Applied Mechanics and Materials, Vols. 71-78, pp. 1318-1323, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yusron Saadi, Agus Suroso, I.B. Giri Putra
Chapter 1: Engineering Hydrogeology and Water Resources
Abstract:Two series of suspended sediment concentration measurement within a stream network carried out during the dry and rainy season are presented...
3