Paper Title:
Stability Analysis and Evaluation of the Dam Influenced by Bridge Construction
  Abstract

Drilling bored piles foundation has been built in the dam and reservoir because of the highway bridge across the dam. Considering the bridge built, the horizontal and vertical force will be passed and act on the dam base. Based on Bishop method, the stability of the dam was analyzed and results showed that the dam can not satisfied with the slope stability requirements. Therefore, concrete measures for reinforced were put forward in order to remove dangers and reinforce the dam.

  Info
Periodical
Chapter
Chapter 3: Frontiers of Civil Engineering
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
1375-1378
DOI
10.4028/www.scientific.net/AMM.71-78.1375
Citation
M. L. Meng, L. W. Han, H. B. Gao, "Stability Analysis and Evaluation of the Dam Influenced by Bridge Construction", Applied Mechanics and Materials, Vols. 71-78, pp. 1375-1378, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yong Huang, Jun Jie Wang, De Yin Jin
Abstract:The damage of bearing will change the boundary condition for whole bridge, if we do not take account of bearing failure, the error of...
1029
Authors: Xia Peng, Xing Nai Wang, Xue Gui
Abstract:Yueniang bridge is curve, slope and slant single span special arch bridge with diagonal crossing arch rib and curved girder. A spatial finite...
915
Authors: Ri Chen Ji, Jun He, Ming Xing Shi
Chapter 23: Meso/Micro Manufacturing Equipment and Processes
Abstract:For the single-track railway concrete-filled steel tube tied-arch bridge, since restrictions of the bridge width will inevitably lead to a...
6079
Authors: Bo Geng, Xi Zhang
Chapter 5: Bridge Engineering
Abstract:On the basis of summarizing the hydrological characteristics and shipping characteristics at the location of Chongqing Caiyuanba Yangtze...
2183