Analysis the Cable Replacement Method of Tianjin Yonghe Bridge
  Abstract

Taking Tianjin Yonghe bridge for example, the finite element method is adopted to simulate each stages of cable replacement process, the dates of tension, the alignment of main beam and the change of stress before and after cable replacement are compared and analysed, The measured value is greatly consistent with calculated value, Stress state of the bridge has been greatly improved, the weight of main beam bearing by the cable will be shared by a few closed cable after unloading, so the cables which are more serious corroded should be replaced.

  Info
Periodical
Chapter
Chapter 3: Frontiers of Civil Engineering
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
1383-1387
DOI
10.4028/www.scientific.net/AMM.71-78.1383
Citation
W. J. Yao, W. Yang, X. Y. Liu, "Analysis the Cable Replacement Method of Tianjin Yonghe Bridge", Applied Mechanics and Materials, Vols. 71-78, pp. 1383-1387, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ru Deng Luo, Hai Long Wang, Jie Hui Hu
Chapter 2: Applied Mechanics, Geo Science, Building, Structural and Civil Engineering
Abstract:In this paper, we have studied a bridge with span-arrangement 112m+80m+32m,which is a three-span single-tower double cable plane swivel...
359
Authors: Xun Wu, Bao Lei Li
Chapter 3: Bridge Engineering
Abstract:The reasonable cable force is the key factor for the safe use of cable-stayed bridge. This paper adopts the method of continuous beam on...
763