Paper Title:
Mechanics Characteristic Analysis on Subway Deep Excavation near Arch Bridge Abutment
  Abstract

Taking Shenyang metro line 2 concentrated in digging deep foundation pit on Beiling station entrance arch bridge abutment in TaiShan road for engineering background, using numerical analysis software "MIDAS" - GTS the article simulates construction step and sequence, then analysis deformation low and stress characteristics of palisade structure, at the same time, it predicts displacement trend about arch bridge abutment, so that it could get the simplified results between abutment foundation and horizontal thrust retaining piles together with change rule of earth pressure along depth and construction process. There is certain significance for this article to other similar engineering research.

  Info
Periodical
Chapter
Chapter 3: Frontiers of Civil Engineering
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
1831-1836
DOI
10.4028/www.scientific.net/AMM.71-78.1831
Citation
Y. Xu, Z. S. Liu, W. Zhao, X. Y. Feng, "Mechanics Characteristic Analysis on Subway Deep Excavation near Arch Bridge Abutment", Applied Mechanics and Materials, Vols. 71-78, pp. 1831-1836, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yan Xu, Zhen Shun Liu, Wen Zhao
Chapter 6: Geotechnical Engineering and Underground Space Structure
Abstract:Subway construction involves a large number of excavation engineering. For the restrictions caused by conditions on the spot,Many foundation...
2955
Authors: Wan Li Chao, Xing Hua Wang
Chapter 1: Advanced Materials Science
Abstract:The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of...
408
Authors: Zhi Hua Li, Xin Zhu Hua, Ruo Jun Zhu, De Sheng Zhou
Chapter 20: Mineral Processing, Mining Engineering and Technology
Abstract:In order to study the strata behavior characteristics in super-long and large mining height working face, the FLAC-3D software was used to...
3428
Authors: Jia Long He, Yu Han Guo, Xi Zhu
Chapter 10: CAD / CAM / CAE and Applications
Abstract:The study on the calculation of the security of high concrete arch dam based on the finite element method will be studied and analyzed in...
829
Authors: Rong Yao, Meng Yun Mao, Yun Que
Chapter 5: Road and Railway Engineering
Abstract:There ware numeral analysis by ABAQUS finite element software to discover the pile’s status with unloading abutment in soft ground, three...
840