Paper Title:
The Fuzzy Comprehensive Evaluation of Hydropower Plant Production and Operating Conditions Based on the BP Neural Network Improved
  Abstract

With the rapid economic growth, the resources and environment condition gradually tightens. We need to accelerate the development of hydropower resources. The electric power produced by the hydropower plants is a kind of green power energy. The quality analysis of hydropower production operation condition will become the focus of our researching. In paper we construct a reasonable set of evaluating indicator system of hydropower production operation and have used the BP neural network and fuzzy quality synthetic to analyze the production and operation condition of several hydropower plants. Help hydropower to summarize experience.

  Info
Periodical
Chapter
Chapter 7: Frontiers of Computer Applicated in Building
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
4170-4173
DOI
10.4028/www.scientific.net/AMM.71-78.4170
Citation
S. L. Liu, Y. X. Song, P. L. Hao, "The Fuzzy Comprehensive Evaluation of Hydropower Plant Production and Operating Conditions Based on the BP Neural Network Improved", Applied Mechanics and Materials, Vols. 71-78, pp. 4170-4173, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hui Zhao, Li Ming Chen
Abstract:A evaluation model based on the integration of analytic hierarchy process (AHP)-rough set theory (RS) and radial basic function (RBF) neural...
2243
Authors: Qing He Chu, Wei Hua Li, Chun Hua Sun
Chapter 12: Development and Management of the Energy Industry
Abstract:Aiming at the operation characteristics of hydropower station and taking Guangxi SanCha power station for example, this paper introduces the...
2905
Authors: Hao Yao Zheng, Jin Bao Sheng, Rong Liang Cheng, Xue Hui Peng, Wei Wei Sun
Chapter 4: Hydraulic Engineering
Abstract:Power plant’s risk factors, the exposure of lower reaches and the capacity to deal with emergency are considered to establish small...
2106
Authors: Liu Hong Chang, Chang Bo Jiang, Yuan Nan Long
Chapter 10: Management and Engineering Education
Abstract:Navigation and hydropower junction is a new model of inland river development. Such projects have significant economic, social and...
1480
Authors: Xiao Guang Lei, Ao Yin
Chapter 2: Energy, Power and Heat Engineering
Abstract:The mathematical model of water consumption rate of LongTan Hydropower Station is established in this thesis. With the aim of reaching the...
218