Paper Title:
Facility Closeness Relationship Determination in the Construction Site
  Abstract

Construction site layout planning (CSLP) is one of the critical activities in construction planning conducted by the managers on the construction sites. CSLP is significantly influenced by the interaction flows and distance between the facilities. The paper aims to apply fuzzy rule-based system developed in the manufacture industry to determine the facility closeness relationship in the construction site. Facility closeness relationship with consideration of quantitative and qualitative factors can be successfully determined by the procedure based on fuzzy rule-based system.

  Info
Periodical
Chapter
Chapter 1: Frontiers of Building Engineering
Edited by
Dongye Sun, Wen-Pei Sung and Ran Chen
Pages
476-479
DOI
10.4028/www.scientific.net/AMM.71-78.476
Citation
X. Ning, "Facility Closeness Relationship Determination in the Construction Site", Applied Mechanics and Materials, Vols. 71-78, pp. 476-479, 2011
Online since
July 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Xu Dong Song, Wei Shao, Zhan Zhi Qiu, Yan Xia Chen
Chapter 3: Detection, Monitoring and Image Processing Technologies, Information Technologies, Control and MEMS
Abstract:In this paper, a new fuzzy inference method for fault diagnosis expert system is proposed. Firstly, fault antecedents were processed by...
639
Authors: Mei Li
Chapter 5: Artificial Intelligence and Algorithms of Optimization
Abstract:Closeness degree is a metric similar levels between two fuzzy sets. This paper extends the closeness degree to the filed of intuitionistic...
426
Authors: Yue Huang, Li Xin Li, Yu Mei Liu
Chapter 11: Management Research
Abstract:The speed and accuracy of project cost are improving with the development of building construction technology and management, however, it...
2626