Paper Title:
Model Test for the Pylon of Cable-Stayed Bridge with Double-Tower-Connected and Four Cable Planes
  Abstract

Yongjiang Bridge in Ningbo is a double-tower-connected cable-stayed bridge which new structure system is very complex and the first one in China. In order to roundly investigate the structural behavior of the double-tower-connected, 3:40 scaled-down model test and space finite element analysis were presented. Test objective, model design principle, the ratio of similarity, test cases, loading method and the strain test point arrangement were introduced in detail. By comparison of two unfavorable test cases, most test data were quite agreeable with the theoretical data, which verified the design concept. The results indicate that the whole resistant behavior is well and the structure is safe and reliable.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
1087-1091
DOI
10.4028/www.scientific.net/AMM.90-93.1087
Citation
Z. Y. Xu, R. D. Zhao, X. Y. Wang, "Model Test for the Pylon of Cable-Stayed Bridge with Double-Tower-Connected and Four Cable Planes", Applied Mechanics and Materials, Vols. 90-93, pp. 1087-1091, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zhou Yuan Xu, Ren Da Zhao
Chapter 3: Mechanical Engineering and Computer Science
Abstract:In order to roundly investigate the whole structural behavior of the jointed pylon of cable-stayed bridge, 3:40 scaled-down model test and...
1096
Authors: Xiao Lin Yu, Bu Yu Jia, Wei Feng Wang, Quan Sheng Yan
Chapter 4: Innovation in Bridge and Underground Engineering
Abstract:In this paper, the construction technology for main pylon of cable-stayed bridge is researched through test of full-scale model of anchorage...
728