Paper Title:
Research on Shallow Buried and Large-Span Tunnelling Undercrossing a Highway
  Abstract

WenXiang tunnel ,one of the tunnels constructed for the ZhengXi Special passenger Railway in china. In this project we have carried out a series of research on optimizing the construction method for shallow and large-span tunnels in loess condition. According to the field monitoring of ground settlement, vault settlement and primary support stress of the tunnel section before tunnelling underneath the LianHuo Highway, the result indicates that soil settlement and primary support stress can not be controlled very well, and current construction program needs to be reformed since it can not meet construction safety requirement. Our synthetical analysis comprises the optimized methods have been used in construction, such as reducing excavation area, increasing excavation steps of pilot tunnel, reserving core soil, closing invert punctually, reinforcing primary support, etc. The security and reliability also has been verified by numerial analysis sofeware FLAC3D. From feedback of field implement and monitoring result, the effect of optimized method is significant; and all of these methods ensured this tough project implemented successfully. These results derived from our research are subject to a ceritain value that could be referred for future analogous project , in terms of controlling soil settlement and protecting surrouding building facilities.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
1748-1756
DOI
10.4028/www.scientific.net/AMM.90-93.1748
Citation
C. Y. Liu, J. Li, Z. S. Tan, "Research on Shallow Buried and Large-Span Tunnelling Undercrossing a Highway", Applied Mechanics and Materials, Vols. 90-93, pp. 1748-1756, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Run Ke Huo, Yong Zhen Yao, Qi Xian Yue
Chapter 3: Security and Life Cycle Engineering Design of Civil Engineering
Abstract:With the development of subway in major cities, the density of underground railway tunnel increases. At the same time, the form and the area...
1446
Authors: Jian Guo, Qi Cai Wang
Chapter 26: Modeling, Analysis, and Simulation of Manufacturing Processes III
Abstract:The bench method dynamic construction process of Xin Baotashan tunnel which located in the grade IV surrounding rock is simulated by using...
6594
Authors: Xin Wang, De Shen Zhao, Meng Lin Xu
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:Based on Dalian subway line 2 from Chun-guang street station to Xiang-gong street station,the three dimensional finite element model was...
1491
Authors: Jian Jia, Shun Hua Zhou, Xi Ping Yao, Chen Shen
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:Jiaohua Square Station of Harbin Metro Line 1 is built by PBA method with the existence of No. 7381 air defense tunnel. In order to control...
1347
Authors: Guang Ming Li, Jin Li Qiao, Pei Chen
Chapter 4: Tunnel, Subway and Underground Facilities
Abstract:With the development construction of subway in the city, the cross tunnel is becoming common. However, due to the geological conditions of...
1270