Research on Blasting Control Technology for Blast in Shallow Tunnel Crossing Existing Buildings
  Abstract

Based on the JIAOZHOU bay subsea tunnel in QINGDAO city, with the experimental equation of charge establishment and coherent code, the blasting control technology for blast in shallow tunnel crossing existing buildings of JIAOZHOU bay subsea tunnel is studied. According to a large number of tunnel construction field test data while blasting and the method of regression Analysis, the vibration wave propagation and the calculation parameters of charge quantity is obtained, then calculating the maximum allowable amount of primary explosive segment. Finally the blasting program is optimized. Based on the above methods,house maximum blasting velocity is controlled under 2cm /s . According to the test results of different floors of the building blasting vibration velocity, the velocity of the first floor is greater than the velocity on each floor, so, the velocity of the first floor is recommended to be the control velocity while the maximum charge quantity is calculated. This study is not only useful to ensure the building’s stabilization when blasting in JIAOZHOU bay subsea tunnel but also offers the theoretical and methodological experiences to the similar engineering.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
1768-1771
DOI
10.4028/www.scientific.net/AMM.90-93.1768
Citation
Y. L. Wang, Z. S. Tan, Y. L. Chi, "Research on Blasting Control Technology for Blast in Shallow Tunnel Crossing Existing Buildings", Applied Mechanics and Materials, Vols. 90-93, pp. 1768-1771, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hai Liang Wang, Tong Wei Gao
Abstract:According to fire station of Tuandao road along to the Yunnan road tunnel of Qingdao Cross-harbor Tunnel Guide Line Project, the blasting...
2608
Authors: Hai Liang Wang, Zhi Shen Wang, Ru Cang Bao, Shao Xian Li
Abstract:The article was based upon analysis of the front-and-back surface vibration velocity of the working surface by monitoring the blasting...
878
Authors: Hai Liang Wang, Xian Bin Xue, Shao Xian Li, Chuan Li
Abstract:The blasting vibration in Qingdao Cross-harbor Tunnel Guide Line Project is monitored and analyzed. We discover that the surface particle...
882
Authors: Yan Ming Ding, Shu Cui Cong, Ren Tao Wang, Hao Wei Li, Hai Liang Wang
Abstract:According to the blasting monitoring of the main tunnel at hidden digging section of Tuandao Second Road exiting ramp in Kiaochow Bay...
3628
Authors: Jun Guo, De Qing Gan, Jing Tan, Guo Bin Yan
Chapter 4: Manufacturing Technologies and Application
Abstract:The blasting vibration effect is one of the most primary dangerous during blasting excavation process. When ground shake caused by blasting...
407