  Abstract

CRD method and three-bench method with temporary invert, which are applied to shallow buried and large cross-section tunnel engineering, are discussed, and simulated by FLAC2D so as to study the variation feature of displacement field, surrounding rock disturbance and internal supporting force caused by the excavation. According to the simulation results, it is proved that CRD method, with higher safety, can control tunnel collapse effectively while three-bench method quickens construction schedule. Therefore, it is recommended that the two methods are used for excavating tunnels alternately if possible so that it will increase economic benefit.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
1834-1839
DOI
10.4028/www.scientific.net/AMM.90-93.1834
Citation
R. B. Wang, X. N. Lin, H. P. Shao, J. S. Yang, Y. L. Huang, "Comparative Analysis of CRD Method and Three-Bench Method with Temporary Invert", Applied Mechanics and Materials, Vols. 90-93, pp. 1834-1839, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Xiu Zhu Yang, Jin Shan Lei, Ye Hui Ning
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:Jet grouting piles were used to reinforce overlying soil of shallow buried tunnel under unsymmetrical pressure. Displacement and strain was...
1685