Paper Title:
Analysis of the Tunnel Construction and Monitoring Measurement under Complicated Geological Conditions
  Abstract

In view of certain areas of Guizhou are soft sandstone rock, where single block of rock's hardness is very low and easily crushed, complicated hydrogeology and low level of complex surrounding rock and geological conditions, geological radar prediction is used before the excavation of the tunnel, and New Austrian Tunneling Method was used in the construction. The process of construction segment had been monitored and measured, and the deformation of tunnel had been controlled. According to the situation during excavation and monitoring, the construction method was further improved. Through tracing and monitoring the tunnel construction of from zk40+430 to zk40+630 sections for two months, showed that the tunnel construction method is effective in this paper.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
2091-2095
DOI
10.4028/www.scientific.net/AMM.90-93.2091
Citation
Z. F. Gu, Z. K. Liu, H. C. Chen, Y. W. Wang, "Analysis of the Tunnel Construction and Monitoring Measurement under Complicated Geological Conditions", Applied Mechanics and Materials, Vols. 90-93, pp. 2091-2095, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Chang Feng Yuan, Guang Ming Yu, Qian Qian Zhao, Jing Bo Zou, Xiao Ming Guan
Abstract:Underground engineering construction in the city can not avoid bringing about perturbation on the surrounding rock and soil and then endanger...
3606
Authors: Wei Min Qiu, Hai Lin Zhang, Gang Wang
Chapter 3: Security and Life Cycle Engineering Design of Civil Engineering
Abstract:With the development of urban construction, deep large pits are often located at intensive underground structure area, and the utility pipe...
1327
Authors: Zhong Ling Zong, Zhen Dong Zhang, Dong Rui Yao
Chapter 9: Monitoring and Control of Structures
Abstract:Based on the analysis of the cause of destruction and damage mechanism, safety monitoring and control technology of artificial island...
2962
Authors: Jian Jun Zhou, Hua Deng, Hao Peng
Chapter 1: Geological and Geotechnical Engineering
Abstract:Dayantang slope was stable before Shuibuya project construction. Based on the long-term safety monitoring, it has appeared the obvious...
415
Authors: Guang Dong Han, Chang Sheng Guan, Jing Zhou
Chapter 10: Disaster-Prevention and Hazard Mitigation for Civil Infrastructures
Abstract:This dissertation mainly analyzes that the deep foundation pit engineering in civil construction, which may impact on the environment and...
978