In the Yellow River crossing tunnel of the middle route project of South-to-North water diversion, its geological conditions are very complicated, so potential risks are much likely to occur in the construction. Based on the fault tree analysis, fuzzy comprehensive evaluation method is also used for the quantitative analysis on the risks during the departure and reception phase of the tunnel construction. And it turns out that, there are risks of collapse of working well, leakage and plasma leakage, mechanical equipment failure and large deviation from the designed axis during the construction. Finally, the measures available of risk aversion are put forward, which have achieved good field applications and also provided some reference value for similar projects in the future construction.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
2125-2130
DOI
10.4028/www.scientific.net/AMM.90-93.2125
Citation
Z. L. Dun, Y. Cao, L. W. Ren, "Risk Analysis during Departure and Reception of Shield in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion", Applied Mechanics and Materials, Vols. 90-93, pp. 2125-2130, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yong Qi Ma, Yin Ning, Yi Dong, Feng Lin Wu
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:The method combining the construction survey and the numerical simulation is proposed in the paper to accurately obtain the deformation of...
1435
Authors: Feng Wang, Tie Jun Cui
Chapter 15: Software and Computer in Research and Engineering Solutions
Abstract:This paper takes the Section 201 of shield construction engineering in Dalian Metro Line 2 as an example to analyze the deformation law of...
2425
Authors: Shao Qin Zhang, Wen Jun Yuan, Hui Hua Zhang, Ling Huang, Yan Fen Zhong
Chapter 4: Tunnel, Subway and Underground Facilities
Abstract:In the present paper, we consider the floating problem of river-crossing shield tunnel in the process of construction. Firstly, based on the...
1087