Paper Title:
Calculation and Analysis of the TBM Construction Rational Buried Depth
  Abstract

The sixth Chongqing metro line is taked for example, numerical simulation is applied for finite analysis and calculation, the safety of the primary support and the second lining are calculated respectively in different level of surrounding rock, double hole case,different bedrock and overlying abandon ballastless thickness for 45 cases,and then based on the result analysis and calculate the rational buried deepth of the surrounding rock under the different level, And according to the actual measurement of deformation calculation value and deformation value of hole is used for comparison, reference and basis for the similar case is presented.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
2803-2807
DOI
10.4028/www.scientific.net/AMM.90-93.2803
Citation
L. N. Ma, S. H. Yan, R. L. Zhang, "Calculation and Analysis of the TBM Construction Rational Buried Depth", Applied Mechanics and Materials, Vols. 90-93, pp. 2803-2807, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Kui Sheng Ma, Min Song, Hou Li Fu
Chapter 2: Disaster Prevention and Reduction of Civil Engineering
Abstract:This paper is basis on previous studies, taking The main haulage roadway of the western district of Zhaogu No.1 mine ,which belongs to...
1078