Paper Title:
Measurement Techniques of Precasting the No.4 Nanjing Yangtze River Bridge’s Segmental Girders by Short-Line
  Abstract

Based on the example of the No.4 Nanjing Yangtze River Bridge, the construction technics of precasting segmental girders by short-line is introduced. And the way of plant deformation monitoring as well as the establishment of horizontal and vertical construction control network in the precast plant are expatiated on. In addition, the measurement techniques during the installation of the fixed-mold, unfixed-mold, lineshape control techniques of the segmental girders, as well as the error correction theories during precasting process are discussed in particular. The short-line is successfully applied to the No.4 Nanjing Yangtze River Bridge, which shows its practical value in precasting segmental concrete bridges.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
2891-2896
DOI
10.4028/www.scientific.net/AMM.90-93.2891
Citation
L. Liu, T. Huang, X. F. Chen, "Measurement Techniques of Precasting the No.4 Nanjing Yangtze River Bridge’s Segmental Girders by Short-Line", Applied Mechanics and Materials, Vols. 90-93, pp. 2891-2896, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: H.M. Lee, Y.H. Kwon, Hyo Seon Park, I. Lee
Abstract:To make use of a new technology in the field of structural health monitoring, various displacement measuring techniques such as a global...
511
Authors: Jin Sheng Du, Hai Bin Liu
Abstract:In some long-span prestressed concrete box girder bridges, excessive deflections of main girders are often observed. These unacceptable...
1436
Authors: Yi Zhou Zhuang, Tao Ji, Bao Chun Chen
Abstract:Based on FEA for three bridge models with varying skew angles, the effect of skew angle on the design moment and shear of skewed bridge...
1244
Authors: Quan Sheng Sun, Tong Wu
Chapter 1: High Strength High Performance Materials and New Structural System
Abstract:In the process of prefabricating some genenal box girder,T girder,I girder,cored slab,a tension of prestress will give rise to the camber...
272