Paper Title:
Evaluation and Governance Design of Risk Factor of Debris Flow on Gunmaling
  Abstract

Abstract: It is analyzed and obtained the result that the debris flow is currently in mature stage with medium risk and high occurrence through the gray correlation method of fractal research and effect measure of debris flow gully. Therefore, it is necessary to take corresponding governance measures. In this article, check dam is used as main preventive engineering measures to set up two check dams in the passing area of debris flow, with total capacity about 2800m3 and design reservoir capacity of flood once per 50 years. Construction of the check dam will effectively reduce risk of debris flow.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
3151-3154
DOI
10.4028/www.scientific.net/AMM.90-93.3151
Citation
L. Nie, L. N. Xu, Y. X. Yu, "Evaluation and Governance Design of Risk Factor of Debris Flow on Gunmaling", Applied Mechanics and Materials, Vols. 90-93, pp. 3151-3154, 2011
Online since
September 2011
Export
Price
$35.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Lin Ke Li, Ai Jun Zhang, Jin Yu Liu, Chun Jiao Hou, Hao Dong Li
Abstract:A new method that 3D numerical simulation combined with anti-cut stability analysis is employed to analyze the stability of Majiabian gravity...
2624
Authors: Chang Chun Wu
Chapter 8: Hydraulic Engineering
Abstract:Through project examples, this paper set up a two-dimensional finite element seepage flow model with the help of the Auto-BANK software, to...
2699
Authors: Fan Feng, Guo Xin Zhang
Chapter 8: Hydraulic Engineering
Abstract:The deep anti-sliding stability of dam foundation has been an important issue in the study of dam field. Rigid body limit equilibrium method...
2776
Authors: Shuai Liu, Hui Peng, Chong Yang Zheng, Shao Lin Liu, Qin Long Yan
Chapter 4: Flood and Drought Management
Abstract:To solve the risk model for dam overtopping and instability of dam slope in the embankment systematic risk, the structural reliability theory...
780
Authors: Shu Qi Ma, Si Jing Cai, Miao Guo
Chapter 3: Geotechnical and Structural Engineering
Abstract:As a major hazard installation in mine the safe and effective running of a tailings dam is very important, therefore the stability analysis...
1406