Paper Title:
The Research on Dynamic Performance of Straight Going Fast Assembling Car Overpass
  Abstract

In order to solve the traffic jams and congestion of urban transportation in most cities, the steel trussed cable-stayed car overpass model is analyzed through the finite element modal analysis by ANSYS software based on the design concept of straight going fast assembling car overpass. After understanding the laws of free vibration characteristics of the structure, the variation of maximum deflections and stresses of the structure which is under the loads moved at different speeds are studied by moving load transient analysis of full method. The result further testifies that the structure is reliable and safe. Also, the range of the optimum speed is summarized to provide reference for the design of speed-limiting facilities of the car overpass.

  Info
Periodical
Edited by
Xuejun Zhou
Pages
845-850
DOI
10.4028/www.scientific.net/AMM.90-93.845
Citation
H. S. Qiu, J. J. Yuan, S. G. Liu, X. M. Huang, "The Research on Dynamic Performance of Straight Going Fast Assembling Car Overpass", Applied Mechanics and Materials, Vols. 90-93, pp. 845-850, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Liu Hui
Abstract:In order to study the dynamic characteristics of a super-long-span cable-stayed bridge which is semi-floating system, the spatial finite...
1496
Authors: Tong Chen Miao, Wen Tao Xu, Xu Zhang
Abstract:In this paper, the dynamic characteristics of short-span suspension arch bridge are analyzed, and the influence of parameters for...
1132
Authors: Yu Liang He, Yi Qiang Xiang, He Xin Ke, Li Si Liu
Chapter 4: Road and Bridge Engineering
Abstract:Taking the four-span 40m simply supported multi-box steel-concrete composite girder bridge in the ProjectⅡ of Qiushi Expressway in Hangzhou...
1547
Authors: Yan Zeng
Chapter 4: Innovation in Bridge and Underground Engineering
Abstract:Static load test was carried out on Hengshui interchange ramp bridge of Lin-Chang expressway. The superstructure of the bridge is...
694