Paper Title:
Research on Precision Construction Measurement of Curved Surface Steel Structure Project
  Abstract

The positioning measurement of spatial curved surface steel structure project is a key link in construction process. How to measure position fast and precisely is an important problem concerned by steel structure project field. Taking actual project as an example, this article studied precision construction measurement technology in curved surface steel structure project, put forward resemble-leveling method elevation measurement, and naturalization lofting method which is based on spatial linear equation. This article has important guiding significance to precise position measurement of curved surface steel structure project and to construction control.

  Info
Periodical
Chapter
Chapter 3: Structural Rehabilitation, Retrofitting and Strengthening
Edited by
Xuejun Zhou
Pages
1363-1368
DOI
10.4028/www.scientific.net/AMM.94-96.1363
Citation
D. J. Wang, G. Y. Wang, "Research on Precision Construction Measurement of Curved Surface Steel Structure Project", Applied Mechanics and Materials, Vols. 94-96, pp. 1363-1368, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ting Jun Li, Jian Li Han, Zhi Yong Liu, Ya Zhou Zhang, Jian Cun Ren
Abstract:Passive location system does not radiate electromagnetic wave, so it can work passively and conceal itself very well. Main factors...
1388
Authors: Qing Du, You Zhong Zhang, Chang Bai Song
Chapter 1: Civil Engineering
Abstract:Construction monitoring is a system, especially for long-span pre-stressed concrete continuous rigid frame bridge. Based on the construction...
274
Authors: De Bao Wang, Xue Ling Fang, Zhao Bo Xing, Jun Huang
Chapter 9: Surveying Engineering
Abstract:As to Jiaonan geodetic datum, third-order horizontal control network is established through GPS while third-order leveling network is...
2864
Authors: Shu Ying Ma, Kai Zhang
Chapter 9: Surveying Engineering
Abstract:Construction of large steel structure is the key point of the whole National Stadium “Bird's Nest” project, while construction of main truss...
2970
Authors: Fang Ru Gui
Chapter 16: Surveying Engineering, Cartography and Geographic Information Systems
Abstract:The analysis of the difficulties of structure measurement of a stadium and the application of total station instrument spatial measurement...
2251