Paper Title:
Analyzing Risks in Public Relationships with Different Stakeholders in an EPC Project Overseas from the Aspect of Contractors
  Abstract

The aim of this research is to investigate the risks in public relationships with different stakeholders in an EPC project overseas from the aspect of contractors. All types of relationships and the relationship risks lying in them are listed, risk responses are recommended correspondingly by putting forwards several major methods. Specifically, risks in contractors and owners are analyzed in this paper. The data collection instrument was an item sequence scored by 11 professors in Tianjin University who had comprehensive understandings about the stakeholders’ relationships in an EPC project abroad. Ways to response to these risks are also recommended by these professors. Chinese corporations undertaking the EPC projects overseas may utilize these findings to identify the risks in public relationships and adopt proper measures to avoid these risks to ensure a successful EPC project overseas.

  Info
Periodical
Chapter
Chapter 8: Engineering Management
Edited by
Xuejun Zhou
Pages
2313-2324
DOI
10.4028/www.scientific.net/AMM.94-96.2313
Citation
L. Gong, "Analyzing Risks in Public Relationships with Different Stakeholders in an EPC Project Overseas from the Aspect of Contractors", Applied Mechanics and Materials, Vols. 94-96, pp. 2313-2324, 2011
Online since
September 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Rong Jie Zhu, Ying Peng, Yang Sun
Chapter 10: Engineering Management and Engineering Education
Abstract:The risk of project contracts is the uncertainty that exists alongside a contract. It is the pressing issue for contractors to prevent and...
2546