Paper Title:
Research on Risk Sharing Mode of the Construction Project Based on Systems Theory
  Abstract

The construction contracts are the important basis of the project risk management and a reasonable contract system can effectively share engineering risks among various project participants. However, the current situation of risk management in China is not optimistic. Based on the analysis of the existing problems in the risk sharing management, the paper introduces Hall three dimension structure into the engineering fields and establishes a three-dimensional (contract dimension, procedure dimension and logic dimension) space structure of the construction project to elaborate the vital role of the contracts in the project risk management. Finally, the paper attempts to put forward a risk sharing mode centered on contract systems to make a reasonable and effective risk distribution among various project participants

  Info
Periodical
Chapter
Chapter 2: Building Technology Science
Edited by
Xuejun Zhou
Pages
233-237
DOI
10.4028/www.scientific.net/AMM.99-100.233
Citation
Y. P. Hu, "Research on Risk Sharing Mode of the Construction Project Based on Systems Theory", Applied Mechanics and Materials, Vols. 99-100, pp. 233-237, 2011
Online since
September 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Qi Yuan Yu, Hao Yue Qiu
Chapter 1: Civil Engineering
Abstract:Based on the study of the influencing law of decision point to cost in the construction process, this paper analyzes the relevance of...
171
Authors: Xing Qiang Peng
Chapter 7: Construction Project Management
Abstract:Abstract. Through analyses of the current situation of investment control in international and domestic engineering supervision companies,...
2885
Authors: Xin Xing Huang, Zhan She Yang
Chapter 7: Construction Project Management
Abstract:Project execution is the guarantee of project success. This paper suggest the project plan system, project organization and governance...
2806
Authors: Dong Xiao Niu, Huan Huan Qiao, Hui Juan Zhai, Xin Lu
Chapter 16: Miscellaneous Topics
Abstract:Combined with the characteristics of the power grid construction projects, based on the fishbone diagram theory, the paper gradually...
1852