Paper Title:
Monitoring and Analysis for Air Defense Shelters in Freeze Soil Region
  Abstract

Abstract. Based on the monitored surrounding rock displacement and the settlement of ground surface and structures of No.7381 tunnel in Harbin, major factors which influence the safety of construction are analyzed and discussed. Results of the analyses indicated, enlargement excavation of tunnel has significant effect on the settlement of ground surface but has less effect on surrounding rock displacement and settlement of structures. Enlargement excavation during rainy season relay influences the structures and ground surface, by contrast, it influences the open-cut part a lot especially for the stability of slopes. It is pointed that the scope which seasonally frozen ground influences in open-cut part is larger than that in underground excavation part but have less effect on the displacement of surrounding rock underground. Seasonally frozen ground also leads to a remarkable displacement of ground surface. The application of temporary steel bracing is needed and effective for controlling surrounding rock displacement and the settlement of ground surface.

  Info
Periodical
Chapter
Chapter 2: Building Technology Science
Edited by
Xuejun Zhou
Pages
332-337
DOI
10.4028/www.scientific.net/AMM.99-100.332
Citation
B. F. Duan, H. C. Li, Y. K. Zhang, M. Zhang, L. Li, "Monitoring and Analysis for Air Defense Shelters in Freeze Soil Region", Applied Mechanics and Materials, Vols. 99-100, pp. 332-337, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Run Ke Huo, Yong Zhen Yao, Qi Xian Yue
Chapter 3: Security and Life Cycle Engineering Design of Civil Engineering
Abstract:With the development of subway in major cities, the density of underground railway tunnel increases. At the same time, the form and the area...
1446
Authors: Jian Guo, Qi Cai Wang
Chapter 26: Modeling, Analysis, and Simulation of Manufacturing Processes III
Abstract:The bench method dynamic construction process of Xin Baotashan tunnel which located in the grade IV surrounding rock is simulated by using...
6594
Authors: Jian Jia, Shun Hua Zhou, Xi Ping Yao, Chen Shen
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:Jiaohua Square Station of Harbin Metro Line 1 is built by PBA method with the existence of No. 7381 air defense tunnel. In order to control...
1347
Authors: Guang Ming Li, Jin Li Qiao, Pei Chen
Chapter 4: Tunnel, Subway and Underground Facilities
Abstract:With the development construction of subway in the city, the cross tunnel is becoming common. However, due to the geological conditions of...
1270