Paper Title:
Analysis on the Generation Operation of the Three Gorges Reservoir during the Experimental Operation Period
  Abstract

The operation of the Three Gorges power station is of the most complex feature in China and even in the world, for it involves many factors such as flood control, power generation, shipping and water supply. This paper takes the experimental reservoir impoundment in 2008 for example, demonstrated its impact on power grid operation, meanwhile, put forward suggestions on impoundment time, impoundment target, impoundment and fluctuating process and adjusting mechanism building, etc.

  Info
Periodical
Chapter
Chapter 2: Building Technology Science
Edited by
Xuejun Zhou
Pages
342-345
DOI
10.4028/www.scientific.net/AMM.99-100.342
Citation
C. M. Ji, Z. Y. Pei, Y. K. Zhang, T. Zhou, "Analysis on the Generation Operation of the Three Gorges Reservoir during the Experimental Operation Period", Applied Mechanics and Materials, Vols. 99-100, pp. 342-345, 2011
Online since
September 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ying Hai Li, Tao Peng, Ji Liu, Xiao Hua Dong
Chapter 8: Hydrology and Irrigation
Abstract:To solve the contradiction between Three Gorges reservoir impounding and downstream drought resistance in flood recession period, impounding...
2157