Paper Title:
Research and Application of SOA-Based Simulation System Used in Hydropower Project
  Abstract

In the field of hydropower project, the overabundance of information from multiplex data sources has forced managers and decision makers to spend much time dealing with information they need. Therefore the research on project simulation system is quite necessary. If system can provide some construction plan and schedule of the project properly, it will greatly improve the effectiveness of the plan. After the analysis of specific projects’ process and demands, this paper puts forward a visual simulation solution to large-scale hydropower construction, which including visual simulation model, design of algorithms and system implementation. Based on SOA structure, the optimization model and the simulation results’ 3D visualization are provided and a virtual three-dimensional world of the complicated coordinal construction process is proposed, with the advantage of direct viewing and real-time interactive, facilitating effective technical support for the decision of project construction design, and greatly enhancing the information level of design and organization of large-scale hydropower projects.

  Info
Periodical
Advanced Materials Research (Volumes 121-122)
Edited by
Donald C. Wunsch II, Honghua Tan, Dehuai Zeng, Qi Luo
Pages
951-957
DOI
10.4028/www.scientific.net/AMR.121-122.951
Citation
D. Y. Meng, L. Wang, Y. Hao, "Research and Application of SOA-Based Simulation System Used in Hydropower Project", Advanced Materials Research, Vols. 121-122, pp. 951-957, 2010
Online since
June 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hao Wu, Jing Tao, Xin Ping Li, Xiu Wen Chi, Nan Chen, Hua Li
Mechanical Control and Information Processing Technology
Abstract:It is necessary for dam concrete construction to take some measures to avoid large haulage equipment collision accident. A collision...
2805
Authors: Guo Zhi Zhang, Wei Gao
Chapter 3: Industrial Robotics and Automation
Abstract:A new measure control technology for testing the compressive strength of concrete structures which is called noumenon sampling method is put...
1283
Authors: Yuan Chun Xia, Dong Fei Lin
Chapter 4: Hydraulic Engineering
Abstract:Yeywa hydropower station RCC dam is located in the torrid zone of Asian, During the construction period, it meet Technical problem of...
2110
Authors: Wen Xiong Huang, Li Ying Tan
Chapter 10: Reliability and Durability of Structures
Abstract:Based on the real construction technology, process and environment of Yuquanxi Bridge, the finite element method was applied in the research...
3236