Paper Title:
A New Technique and its Application in the Conservation of Historical Masonry Constructions - Underpinning by Manual Pipe-Jacking
  Abstract

The structural damages, which result from the inadequate bearing capacity or the asymmetric support of foundation, are one of the crucial works in the conservation of historical masonry constructions. Firstly ,the box girders are slowly and evenly jacked by the manual pipe jacking technique ,and then casting the core beam to form a whole, so the construction is gradually situated on a "tray" with sufficient rigidity. Consequently, the structural damages caused by the inadequate bearing capacity or the asymmetric support of foundation is thoroughly treated. Based on the field test, the principle of the underpinning by manual pipe-jacking , the mutual effect mechanism between box girders and soil, the calculation of jacking force and its influence factors are investigated in detail, and the empirical formula of calculating jacking force is also presented.

  Info
Periodical
Advanced Materials Research (Volumes 133-134)
Edited by
Xianglin Gu and Xiaobin Song
Pages
1077-1082
DOI
10.4028/www.scientific.net/AMR.133-134.1077
Citation
W. X. Zhang, P. Chen, D. Zhao, Y. Q. Zhang, "A New Technique and its Application in the Conservation of Historical Masonry Constructions - Underpinning by Manual Pipe-Jacking ", Advanced Materials Research, Vols. 133-134, pp. 1077-1082, 2010
Online since
October 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yu Hong Zhang, Jian Shun Zhang
Abstract:The impact on curved box girder bridges due to applying prestressing force have been analyzed using finite element method. This paper...
1022
Authors: Zhong Hu, Da Yi Ding, Yuan Qing Wang, Li Yuan Liu, Hai Ying Wan
Abstract:The curved box-girders of Hefei Xinqiao International Airport Terminal were taken as a background of this article. Aiming at the type of the...
818
Authors: Da Long Ren, Shui Wan
Chapter 2: Frontiers of Building Materials
Abstract:The structure characteristic of prestressed concrete(PC) composite box-girder with corrugated steel webs is introduced, and the advantage is...
1168
Authors: Hong Zhang, Ren Zhong Zhou
Chapter 2: Bridge Engineering
Abstract:Techniques of lifting large segments of steel box girder by floating crane is used in construction of Chongqi Bridge. Considering the...
1094
Authors: Yusep Muslih Purwana, Niken Silmi Surjandari, Haryanto Wahyu
Chapter 2: Geotechnical Engineering
Abstract:Jack-in piling is environmental friendly system enabling placement of the pile into soil layer with minimum disturbance. It works with very...
70