Paper Title:

A Joint Model of Production and Preventive Maintenance Plan

Periodical Advanced Materials Research (Volumes 156 - 157)
Main Theme Advanced Manufacturing Technology
Edited by Jingtao Han, Zhengyi Jiang and Sihai Jiao
Pages 18-23
DOI 10.4028/www.scientific.net/AMR.156-157.18
Citation Zhi Qiang Lu et al., 2010, Advanced Materials Research, 156-157, 18
Online since October, 2010
Authors Zhi Qiang Lu, Yue Jun Zhang
Keywords Capacitated Lot-Sizing Problem (CLSP), Reliability, Run-Based PM, Threshold
Price US$ 28,-
Article Preview
View full size
Abstract

We integrated run-based preventive maintenance (PM) into the production plan at the tactical level. The production plan was based on the single level capacitated lot-sizing problem (CLSP). We assumed the system reliability should be kept above certain threshold value to ensure the feasibility of the production plan; the reliability would be affected only by system running. Thus, PM would be triggered by the reliability requirement and the accumulated running time. We established this relationship as a nonlinear integer constraint in the joint model. We also proposed a branch and bound algorithm using CPLEX to solve the model. Finally, a numerical example was given to illustrate the difference between run-based and time-based PM.