Paper Title:
Characteristics of Multi-Storied Brick-and-Concrete Buildings Response to Blasting Vibration of Tunnel Excavation
  Abstract

According to fire station of Tuandao road along to the Yunnan road tunnel of Qingdao Cross-harbor Tunnel Guide Line Project, the blasting vibration test was carried on. This building is three-storied brick-and-concrete building. Then monitoring data of particle vibration velocity was analysised and researched. The results showed that there is magnifying effect of vertical vibration velocity on the roof of the building, but its value is lesser than particle vibration velocity of the first layer. Horizontal tangential vibration velocity was existed on the central of the building. However there was no magnifying effect of horizontal radial vibration velocity. And its value is decreased rapidly from the first layer to the second layer, and then other floors basically keep steady.

  Info
Periodical
Advanced Materials Research (Volumes 163-167)
Edited by
Lijuan Li
Pages
2608-2612
DOI
10.4028/www.scientific.net/AMR.163-167.2608
Citation
H. L. Wang, T. W. Gao, "Characteristics of Multi-Storied Brick-and-Concrete Buildings Response to Blasting Vibration of Tunnel Excavation", Advanced Materials Research, Vols. 163-167, pp. 2608-2612, 2011
Online since
December 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hai Liang Wang, Zhi Shen Wang, Ru Cang Bao, Shao Xian Li
Abstract:The article was based upon analysis of the front-and-back surface vibration velocity of the working surface by monitoring the blasting...
878
Authors: Yan Ming Ding, Shu Cui Cong, Ren Tao Wang, Hao Wei Li, Hai Liang Wang
Abstract:According to the blasting monitoring of the main tunnel at hidden digging section of Tuandao Second Road exiting ramp in Kiaochow Bay...
3628
Authors: Yong Ming Han, Yi Zhou, Hai Liang Wang
Chapter 5: Tunnel, Subway and Underground Facilities
Abstract:Put the first Phase Project of Qingdao Metro (line 3) civil 03 bid section TAI-YAN interval of blasting construction as the background In...
982