Paper Title:
Construction Technology of Treatment Measure of Swelling Rock Slope Replaced Backfilling Clay
  Abstract

Replaced backfilling clay is one of the treatment measures in the Luwangfen swelling rock test Region of middle-route of South-to-North Water Division Project. First, by using 18 tons vibration roller compaction mechanism, on the condition of 3 different thicknesss and 5 different compaction times, settlement, dry density, water content and permeability coefficient are studied before and after the compaction test to find out the optimal thickness and compaction times. Then, by using different compaction mechanisms, the compaction effect is studied on the condition of the optimal thickness and compaction times. Results show that the compaction degree of replaced backfilling clay is 100.0% on the condition that the quantity of vibration bumping roller is above 18 tons, thickness of replaced backfilling clay is no more than 35.0cm and at least it is compacted at least 12 times. Finally, the construction parameters of compaction and related quality controlling index is proposed, which is provided as a reference for design, mechanism’s choice, compaction parameter and quality control index.

  Info
Periodical
Advanced Materials Research (Volumes 168-170)
Edited by
Lijuan Li
Pages
2334-2339
DOI
10.4028/www.scientific.net/AMR.168-170.2334
Citation
F. Y. Tan, R. H. Zou, H. B. Hu, Z. K. Lin, "Construction Technology of Treatment Measure of Swelling Rock Slope Replaced Backfilling Clay", Advanced Materials Research, Vols. 168-170, pp. 2334-2339, 2011
Online since
December 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zun Jie Hu, Li Ming, Ji Yao Li, Xing Yu Hou, Ming Guang Sun
Chaper 10: Energy Security and Clean Use
Abstract:This systematic study of the red mud dam and the formation of cracks in the mechanism, and summarize a variety of cracks in the dam...
3863
Authors: Hao Feng Xing, Ming Hui Meng, Wan Xue Long, Guan Bao Ye, Wen Yong He
Chapter 3: Geotechnical Engineering
Abstract:It is difficult for the large diameter pile to bore the hole and ensure its quality under the complicated geological condition in karst...
1486
Authors: Ying Gao, Ting Hua Zhao, Jie Bao
Chapter 2: Innovation in Civil and Hydraulic Engineering
Abstract:Combined with the Luwangfen test section in the Middle Line of SNWT, the geosynthetic reinforcing technology which is an efficient treatment...
419
Authors: Ya Ping Wu, Gao Feng Pan, Hai Dong Hu, Gang Wang, Jun Wang, Zhi Biao Xu
Chapter 7: Architecture, Building Materials and Construction Technologies
Abstract:In this paper, a key treatment technology of the culvert foundation is presented, which is on the high salt saturated fine sand in a new...
559