Paper Title:
Research on Joint Scheduling of Multiple Imaging Satellites with Multiple Sensors
  Abstract

Guided by the application requirements of imaging satellite, this work focuses on the model construction and heuristic rule design to the joint scheduling problem of multi imaging satellites. It analyses the imaging procedure, imaging constraints, inputs and outputs, the basic scheduling flow and characteristics of the joint scheduling problem of multi imaging satellites. The heuristic algorithm was proposed to effectively solve this problem. Finally, a multi imaging satellites scheduling system is developed.

  Info
Periodical
Edited by
Wenya Tian and Linli Xu
Pages
616-620
DOI
10.4028/www.scientific.net/AMR.186.616
Citation
Y. Feng, R. J. He, J. F. Li, L. N. Xing, "Research on Joint Scheduling of Multiple Imaging Satellites with Multiple Sensors", Advanced Materials Research, Vol. 186, pp. 616-620, 2011
Online since
January 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: James C. Chen, Wun Hao Jaong, Cheng Ju Sun, Hung Yu Lee, Jenn Sheng Wu, Chung Chao Ku
Abstract:Resource-constrained multi-project scheduling problems (RCMPSP) consider precedence relationship among activities and the capacity...
633
Authors: Bing Li Zhou, Qun Zhang
Chapter 2: Manufacturing Processes and Systems: Automation and Control
Abstract:A nonlinear model is proposed for balancing the steel productive resources. In the model, the sharing and the competition between products...
591
Authors: Lin Wu, Cai Li Fang, Cao Kun Yan
Chapter 18: Development Computer Applications in Industry, Networks Applications
Abstract:Under dynamic, unreliable grid environment, a novel heuristic based on average reliability of task is proposed, which task into account the...
2895
Authors: Xiao Jian Han, Xiang Fang Ding, Chun Xiao
Chapter 3: Development Elecrtonics, Networks, Information Technology and Algorithms in Systems Applications
Abstract:How to get the most optimal solution of equipment layout in the aircraft cabin of the limited space is a completely NP problem. The problem...
659
Authors: H.M.E. Kays, A.N. Mustafizul Karim, M.N.B. Tajudin, M. Abdesselam
Chapter 10: Manufacturing and Engineering Management
Abstract:A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet...
610