Paper Title:
Task Scheduling of Product Development Process Based on Complex Features of Web
  Abstract

Multi-task scheduling networkis extended based on the complex network theory, from new angles and perspectives to study the multi-task scheduling. The description of method and related mathematical models of complex and multi-task directed network aregiven. Combined with topology of the product development process and their own characteristics,the evaluation model and algorithmto describe the importance of the event node are presented. It can assess the nature ofdifferent nodes effectively, including the key nodes, at the same time,the scheduling algorithm based on the importance of active nodes hasbeen proposed.The study has a certain significance toarrange the execution of tasksin complex product development process reasonably and realize optimal allocation of manufacturing resources.

  Info
Periodical
Advanced Materials Research (Volumes 201-203)
Edited by
Daoguo Yang, Tianlong Gu, Huaiying Zhou, Jianmin Zeng and Zhengyi Jiang
Pages
1003-1007
DOI
10.4028/www.scientific.net/AMR.201-203.1003
Citation
X. J. Li, Y. P. Yuan, "Task Scheduling of Product Development Process Based on Complex Features of Web", Advanced Materials Research, Vols. 201-203, pp. 1003-1007, 2011
Online since
February 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Guo Hai Zhang, Guang Hui Zhou, Xue Qun Su
Abstract:This paper presents a new kind of scheduling solution for multiple design tasks in networked developing environments. The main contributions...
163
Authors: Ying Zi Li, Shuo Zhang, Xiao Dong Zhang, Le Luo
Abstract:In order to obtain the optimal scheduling plan which includes the reasonable task start time and resource allocation for complex product...
566
Authors: Yao Feng, Ren Jie He, Ju Fang Li, Li Ning Xing
Abstract:Guided by the application requirements of imaging satellite, this work focuses on the model construction and heuristic rule design to the...
616
Authors: Zhi Ling Yuan, Yi Ping Yuan, Meng Yang
Chapter 4: Computer Integrated Manufacturing System and Contemporary Integrated Manufacturing System
Abstract:Job Shop scheduling problem, the essence of which is the resources scheduling problem, which has been proved to be a complete NP-hard...
799
Authors: Zhong Tang He, Xiao Qing Zhang, Heng Xi Zhang, Zhi Wei Xu
Chapter 4: Automation, Control and Monitoring Technologies, Software and Information Engineering
Abstract:In this paper, the principle and mechanism of CloudSim is analyzed. The layered architecture of CloudSim is emphasized, including user code...
829