Paper Title:
Integrated Scheduling Algorithm with Setup Time
  Abstract

Aiming at the problem that there is no research result in the complex products processing and assemble integrated scheduling problem with setup time, this paper proposes strategy to resolve this problem. That is to determine scheduling sequence of procedures according to layer priority strategy, shorten time strategy and long path strategy. Then adopt algorithm of inserting setup time dynamically to determine the start time of procedures by scheduling sequence. As this algorithm avoids to move scheduled procedures many times after inserting setup time, the time complexity is only secondary. So this algorithm is simple and has high scheduling efficiency.

  Info
Periodical
Edited by
Zhang Yushu
Pages
226-230
DOI
10.4028/www.scientific.net/AMR.213.226
Citation
Z. Q. Xie, J. Yang, Y. Z. Teng, L. Lan, "Integrated Scheduling Algorithm with Setup Time", Advanced Materials Research, Vol. 213, pp. 226-230, 2011
Online since
February 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zhi Qiang Xie, Jing Yang, Yu Jing He, Guang Jie Ye
Abstract:Aiming at the dynamic integrated scheduling problem of complex multi-products with different arriving time and identical machines, an...
897
Authors: Guang Nian Yang, Wei Qi, Jun Zhou
Abstract:Now, our sewage treatment industry mainly depends on the blower of aeration act as metabolic, absorbed in the toxic substances. Blower...
591
Authors: Zong Hui Wang, Shu Su Shi, Li Cheng Yu, Wen Zhi Chen
Chapter 16: Geographic Information and Remote Sensing Science
Abstract:FCD-based traffic navigation system is getting more and more attention from countries all over the world. Shortest path algorithm is one of...
2880
Authors: Fang Li, Yu Wang, Ying Chun Zhong, Zhi Tan
Chapter 16: Application of Information and Network Technology
Abstract:An optimization of multi-varieties and small-batch of production scheduling is proposed, which is embodied the utilization ratio of...
3177
Authors: Hai Yan Wang
Chapter 6: Production Management
Abstract:This paper presents a hybrid algorithm to address the flexible job-shop scheduling problem (FJSP). Based on Differential Evolution (DE), a...
502