Paper Title:
Research on the Time-Varying Interaction of Structure and High Assembled Support System
  Abstract

With the accelerating process of urbanization, various kinds of unconventional concrete structure increases day by day. According to the Monitoring work achievement of the Memorial Hall for the Battle of crossing Yangtze River, the support system is a new kind of formwork support system that is made up of profiled bars and steel tubes. This support system with high bearing capacity and rigidity is suitable for all kinds of complex structures. The interaction mechanism between cantilever structure and support system and the force distribution rule of the members in structure and support system were studied in the paper. On based of above researches the time-varying model which is made up of the structure and high assembled formwork support system was put up to calculate the bearing capacity of the support system.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
112-115
DOI
10.4028/www.scientific.net/AMR.243-249.112
Citation
K. W. Ding, J. H. Cui, "Research on the Time-Varying Interaction of Structure and High Assembled Support System", Advanced Materials Research, Vols. 243-249, pp. 112-115, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Wei Jun Yang, Yong Da Yang
Chapter 7: Construction Technology of Large Complex Structure
Abstract:New full hall scaffolds with pulley-clip style formwork support system is adopted in the concert hall of Changsha. This paper presents the...
3052
Authors: Ke Wei Ding, Ling Wang
Chapter 12: Monitoring and Control of Structures
Abstract:Based on the Yunding project as the project background, according to the strut frame system of the force change and laminates of the force,...
3243
Authors: Jian Hua Cui, Ping Liu
Chapter 3: Materials Engineering
Abstract:Based on the construction of the transfer floor of Yunding project in Chengdu, to solve the issues from the integral stability and safety of...
291