Paper Title:
Study on Application of Strengthening Method and its Optimization on Continuous Box Girder Bridge
  Abstract

According to the mechanical characteristics of the continuous box girder bridge and the disaster situation, a combined strengthening method was used to strengthen Yingyugou Viaduct. The 3D numerical simulation method was used to analyze the effectiveness of external prestressing reinforcement technology, external sticking steel plate method, increasing section method and gluing CFRP method. Based on the analysis, the original design scheme was optimized to take advantage of each strengthening method, and improve the overall effectiveness of the combination strengthening method.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
1553-1556
DOI
10.4028/www.scientific.net/AMR.243-249.1553
Citation
R. He, W. He, Y. F. Su, "Study on Application of Strengthening Method and its Optimization on Continuous Box Girder Bridge", Advanced Materials Research, Vols. 243-249, pp. 1553-1556, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zong Lin Wang, Li Hui Qin
Abstract:Gravity abutment widely uses for substructure part of the bridge structure. For many reasons, there are many damages take place in the parts...
1618
Authors: Yu Liang He, Yi Qiang Xiang, He Xin Ke, Li Si Liu
Chapter 4: Road and Bridge Engineering
Abstract:Taking the four-span 40m simply supported multi-box steel-concrete composite girder bridge in the ProjectⅡ of Qiushi Expressway in Hangzhou...
1547
Authors: Chun Sheng Wang, Lu Ping Liu, Mao Sen Wei
Abstract:The Yao Zhou downlink Viaduct damaged in a fire accident was repaired using steel plate and concrete composite strengthening (SPCCS)...
145
Authors: Bao Rong Huo, Guang Ning Yang, Xiang Dong Zhang
Chapter 7: Bridge Engineering
Abstract:Because of two-way curved arch bridge with low design load, less structural steel, improper construction, overloading and poor integrity,...
1561
Authors: Yan Zeng
Chapter 4: Innovation in Bridge and Underground Engineering
Abstract:Static load test was carried out on Hengshui interchange ramp bridge of Lin-Chang expressway. The superstructure of the bridge is...
694