Paper Title:
Risk Control in the Deep Excavations with the Application of the Observational Method
  Abstract

The uncertainty of the ground, in which a deep excavation to be conducted, is always inherent. The risk control of the excavation is therefore necessary. Based on the principle features of a deep excavation, a general process of risk control is presented in terms of design and construction, with the application of the observational method. To avoid the conflicts of the involved groups’ interests, a close co-operation between the groups in a well planned procedure is vital to the success of the risk control, especially to the case with rapid deterioration stages included.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
3403-3410
DOI
10.4028/www.scientific.net/AMR.243-249.3403
Citation
J. Q. Ma, "Risk Control in the Deep Excavations with the Application of the Observational Method", Advanced Materials Research, Vols. 243-249, pp. 3403-3410, 2011
Online since
May 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jin Song Gui, Qing Meng, Zhen Guo Li, Bo Zhang
Abstract:In this paper, the basin excavation process is numerically simulated by using the geotechnical engineering software PLAXIS, and the bending...
2818
Authors: Hong Ye Chen, Jing Fei Zhang, Hui Zhong Ma, Jin Ying Ma
Abstract:In order to study and demonstrate the safety condition of urban track transportation system in mechanics area, and to determine the key...
1812
Authors: You Feng Zhang, Mei Feng Cai
Chapter 6: Geotechnical Engineering
Abstract:The shortages and drawbacks of traditional geotechnical engineering monitoring and controlling system(GEMCS) is reviewed and the necessity...
1561