Paper Title:
FEM Research on the Impact of Changsha Subway Construction to Wan Dai Hotel
  Abstract

For the Wuyi Square Station of Changsha Subway is close to Wan Dai Hotel, the construction process is simulated by FEM software Abaqus to research the settlement and distortion of the hotel building in this paper. To simulate the soil layers and diaphragm walls, compared seepage and stress are considered in the three dimensional elastic-plasticity model, in which the building is replaced by uniform load on the ground and horizontal supports are simulated by uniform load or moving distances. The vertical displacement of building foundation has been calculated, and recharging water has been simulated outside the pit. Finally, the control standards of building settlement are proposed to control the construction security of Changsha Metro Line 2.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
3411-3416
DOI
10.4028/www.scientific.net/AMR.243-249.3411
Citation
Z. N. Li, Z. Y. Wu, D. F. Luo, "FEM Research on the Impact of Changsha Subway Construction to Wan Dai Hotel", Advanced Materials Research, Vols. 243-249, pp. 3411-3416, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yu Yong Fu, Shu Wang Yan
Abstract:This article adopts the general finite element analysis software——ANSYS to do the numerical analysis and research on some Composite Soil...
1608
Authors: Qing Guan Lei, Qin Jie Dai, Jian Guo Wang
Chapter 5: Biotechnology, Chemical and Materials Engineering
Abstract:Based on the experimental data in the literature, contact elements were used in the pile-soil interface and the pile-soil interaction was...
733
Authors: Guan Shui Liu, Lian Wei Sun, Bo Wang, Shi Ming Wu, Cheng Po Hong, Qi Hong
Chapter 3: Geotechnical and Structural Engineering
Abstract:In this work, research was carried out based on the shield tunnel of metro line 1 in Hangzhou. The construction of this tunnel beneath the...
1488
Authors: Li Jun Zhou, Ziai Lu, Wen Juan Wang
Chapter 1: Geological and Geotechnical Engineering
Abstract:Pile foundation design has gradually used the super-long pile structure form with the port and offshore engineering construction developing...
471
Authors: Guang Dong Han, Chang Sheng Guan, Jing Zhou
Chapter 10: Disaster-Prevention and Hazard Mitigation for Civil Infrastructures
Abstract:This dissertation mainly analyzes that the deep foundation pit engineering in civil construction, which may impact on the environment and...
978