Paper Title:
Application of Fuzzy AHP to the Comparison and Selection of Cement Concrete Pavement Overlaying Schemes
  Abstract

Based on a comprehensive analysis of the influencing factors and special features of cement concrete pavement overlaying technology, a fuzzy analytic hierarchy process (AHP) model is constructed for the comparison and selection of overlaying schemes. At first, the numerical weight for each criterion of the hierarchy is derived and tested. Then the feature matrices of all the schemes are constructed based on experts’ evaluation. The optimal scheme is chosen according to the numerical priorities of each scheme yielded by fuzzy calculation.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
4302-4306
DOI
10.4028/www.scientific.net/AMR.243-249.4302
Citation
J. F. Liang, X. D. Zhang, L. Wu, "Application of Fuzzy AHP to the Comparison and Selection of Cement Concrete Pavement Overlaying Schemes", Advanced Materials Research, Vols. 243-249, pp. 4302-4306, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Shi An, J. Wang, J.P. Qian
Abstract:Recognizing and evaluating the development level of a country’s precise finishing industry, is the prerequisite to the country’s...
864
Authors: Cheng Hua Li, Xiao Hong Yun, Hui Mao
Chapter 8: Engineering Management
Abstract:Owing to the increasing complexity in the construction safety management, integrating experts' knowledge and experiences to make appropriate...
2308
Authors: Han Jing Cui, Chuan Zheng Zhu, Lei Wang
Chapter 3: Mechatronics, Control and Automation, Measurement and Measuring Equipment
Abstract:Based on the research of the law of performance of electrical and mechanical equipments, the characteristics of highway electromechanical...
892
Authors: Xiang Yu, Xue Qing Zhang
Chapter 4: Hydrology, Coastal and Geotechnical Engineering
Abstract:The scheduling of a hydrothermal power system needs to take into account multiple economic, social and environmental criteria, such as power...
1367