Paper Title:
Heightening Design and Construction of the Reinforcement Concrete Chimney in Heated State
  Abstract

This paper introduced a project of reinforced concrete chimney with a height of 90 meters, which does not stop construction at nearly 200 degree Celsius, increased the height of the chimney with 10 meters. Reasonable structural measures were promoted to ensure the normal pouring of concrete chimneys. Compared with the normal condition, this measure is economical, low investment, feasible, etc. It provides far-reaching significance that increasing the height of the reinforced concrete chimney at the high temperature state.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
5610-5613
DOI
10.4028/www.scientific.net/AMR.243-249.5610
Citation
H. B. Liu, M. Li, "Heightening Design and Construction of the Reinforcement Concrete Chimney in Heated State", Advanced Materials Research, Vols. 243-249, pp. 5610-5613, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ping Huang, Ning Xiong Wang, Lan Hua Zhou
Chapter 2: Structural Engineering
Abstract:A complex brick-structure chimney with a height of 56 meters was successfully demolished without recoil through directional blasting in...
1078
Authors: Fang Yang, De Peng Lv, Hua Cao, Yan Fang Zhou, Yu Rong Wu
Chapter 7: Seismic Engineering
Abstract:In the state that the chimney is being used, we evaluate the seismic performance of the reinforced concrete chimney on the basis of testing...
2399
Authors: Yan Hui Li, Yang Yang Zhang, Jing Cun Wei, Yun Feng Wu
Chapter 8: Traditional Construction Materials
Abstract:Through calculation and analysis on routine examination and neutralization of reinforced concrete chimney, the service life of concrete...
1672