Paper Title:
Fuzzy Analytic Hierarchy in Project Risk Management - New Stadium Construction Project in Weifang City
  Abstract

In the field of engineering and construction, unqualified construction quality, time delays, cost more than expected phenomena to occur. Because of these characteristics such as its large-scale construction projects, long cycle, the production of single and complex, there is greater risk than the production of general products, the risk increases the difficulty of construction project management, operating costs and the possibility of potential losses, therefore, risk management emerged and become an increasingly important integral part of project management. In this paper, fuzzy analytic hierarchy be used to construction project risk assessment, and to order the sort of each risk in order to prevent significant risks. On an actual project - the new stadium construction in Weifang City risk management case study, the reduction of risk of project failure is expected, but also the project is hoped for other industries to provide some reference for risk management.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
6362-6368
DOI
10.4028/www.scientific.net/AMR.243-249.6362
Citation
Y. Zhang, C. J. Liu, "Fuzzy Analytic Hierarchy in Project Risk Management - New Stadium Construction Project in Weifang City", Advanced Materials Research, Vols. 243-249, pp. 6362-6368, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jian Wei Zhang, Min Jie Zhu, Li Wei Zhang
Chapter 1: Frontiers of Building Engineering
Abstract:There is all kinds of risk consisting in every logistic transportation link of construction because of the bigger construction transportation...
399
Authors: Gao Yang Li
Chapter 1: Mechatronics
Abstract:This paper builds projects risk evaluation index system, and makes the projects risk evaluation from a qualitative assessment to a...
1221
Authors: Cheng Tie Tang, Zhen Hao Zhang, Zhi Gang He
Chapter 10: Management and Engineering Education
Abstract:The risk of bridge and tunnel engineering in construction stage is a main subject which must be faced by bridge and tunnel engineer. Risk...
1402
Authors: Hong Yan Liu, Shi Zheng Liu
Chapter 15: Power System, Automation and Control
Abstract:With the rapid development of Chinese economic, environmental pollution, energy shortages and other issues become increasingly prominent....
2358
Authors: Zuo Gong Wang, Jie Zheng, Hui Yang Li
Chapter 16: Mining Engineering and Coal Mining
Abstract:Mining project investment has a lot of features, such as long period, slow effect, big capital size, irreversible investment, the numerous...
2928