Paper Title:
A New Grade Method on Project Bid Evaluation
  Abstract

In bid evaluation, the regular grade method on the grade items is that the grade message is composed of average value after throwing away the highest and lowest value, which essence is considered that the expert’s weight is zeroed. It is pointed the processing is too simple and unable to deal with all kinds of problems effectively in the match. Basing on numerical statistics, referencing multiple attributes and comprehensive decision theory, a grade method is put forward to empower expert weight. The method according to the results consistence of the expert grade determines the grade weight, then correcting their grade weight to each specific bid, fully using all grade message coming from the bid evaluation team. Its computation is simple and easy to computer processing. So it has larger practical value. Last, the new method is used in bid evaluation on excavation support project located in Wenchang Garden, Yantai Development Zone. It shows the practical value of this method.

  Info
Periodical
Advanced Materials Research (Volumes 243-249)
Edited by
Chaohe Chen, Yong Huang and Guangfan Li
Pages
6400-6403
DOI
10.4028/www.scientific.net/AMR.243-249.6400
Citation
H. Liu, S. Y. Qu, S. M. Cui, F. W. Zhang, "A New Grade Method on Project Bid Evaluation", Advanced Materials Research, Vols. 243-249, pp. 6400-6403, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Qing Ying Meng, Cai Li Zhang, Ti Song, Ning Li Li
Chapter 7: Road and Railway Engineering
Abstract:By analysising the disadvantages of the current bid evaluation methods used in highway project,the article builds up TOPSIS model based on...
1365
Authors: Jun Chen
Chapter 7: Management Science Engineering, Economics, Logistics and Business Applications
Abstract:the biggest characteristics of Bidding are openness, fairness and preferred. The essence of the tender and bid is making advanced productive...
775