Paper Title:
In Situ Test and Mechanical Analysis of Multi-Arch Tunnel with Large Section in Soft and Weak Rock Mass
  Abstract

According to the characteristic of multi-arch highway tunnel,based on a practice engineering, the monitoring work was consisted of four sections:the displacement of surrounding rock; such as crown settlement, displacement of the ground, displacement of inner surrounding rock; that of stress and stain of support structure; that of force in middle-wall. In course of construction,monitoring data was analyzed in time.Structural timbering parameters were modified in response to abnormal monitoring data in order to guarantee safety.the testing results of the safety monitoring system are satisfactory, which serves as a symbol of our research work. Thus, our engineering practice has proved the applicability and feasibility of the safety monitoring and information construction methods.

  Info
Periodical
Advanced Materials Research (Volumes 250-253)
Edited by
Guangfan Li, Yong Huang and Chaohe Chen
Pages
1262-1265
DOI
10.4028/www.scientific.net/AMR.250-253.1262
Citation
T. Liu, Z. C. Dong, H. Y. Yang, "In Situ Test and Mechanical Analysis of Multi-Arch Tunnel with Large Section in Soft and Weak Rock Mass", Advanced Materials Research, Vols. 250-253, pp. 1262-1265, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Lin Jie Chen, Bo Liang, Zhi Yong Wang
Abstract:Based on soil-structure interaction model, the seismic dynamic response of tunnel in karst areas were performed by using viscous-spring...
2108
Authors: Lin Jie Chen, Bo Liang
Abstract:Based on soil-structure interaction model, the response analyses of the Menglian tunnel by using viscous-spring artificial boundary and time...
2178
Authors: Ming Li Huang, Yan Jun Zhou, Ya Chao Huo
Abstract:For the cut and cover section of "framework + arch” modular structure of Xiamen Airport Road Project. Based on tunnel design section and...
2237
Authors: Xiu Zhu Yang, Jin Shan Lei, Ye Hui Ning
Chapter 3: Tunnel, Subway and Underground Facilities
Abstract:Jet grouting piles were used to reinforce overlying soil of shallow buried tunnel under unsymmetrical pressure. Displacement and strain was...
1685
Authors: Hong Xia Li, Yan Qin Guo, Yong Wei Wang
Chapter 2: Structural Engineering
Abstract:Composite support structure of continuous arch internal support is a new type of maintenance structure of deep foundation. In this paper, as...
1125