Paper Title:
Study on Excavation Method of Tunnel with Super Cross-Section and Super Large Section Area Underpass Extra-High Building
  Abstract

Because double side drift excavation method named eye excavation method has been a mature and reliable excavation method, it has normally been used in tunnels with super cross-section and super large section area. However, the construction speed using this method is very slow. One of reasons is that the construction technology of this method would be more and complex. The other is that all construction workers, materials, equipment would be extremely difficult for their up and down, and that the ballast rock would have to be moved by artificial when the upper step of the middle guide hole would be excavated. In this paper, to speed up the process of excavating tunnel with super cross-section and super large section area underpass extra-high building, the elastic-plastic numerical simulations for the tunnel named Industry and Trade Station of the third line in Chongqing Rail Transit were made in four excavation methods conditions. The four excavation methods is respectively the double side drift excavation method to the first excavation in main building side, the double side drift excavation method to the first excavation in podium side, the single side drift excavation method in the upper step to the first excavation in main building side and the single side drift excavation method in the upper step to the first excavation in podium side. The main building is named Industry and Trade building with 22 floors. The results showed that the single side drift excavation method in the upper step could Insure the building and tunnel when the support measures were reasonable, that the guide hole beside the little surface load should firstly be excavated by whether double side drift excavation method or single side drift excavation method, and that these would provide a reference for some similar engineering.

  Info
Periodical
Advanced Materials Research (Volumes 250-253)
Edited by
Guangfan Li, Yong Huang and Chaohe Chen
Pages
2057-2067
DOI
10.4028/www.scientific.net/AMR.250-253.2057
Citation
X. F. Zhang, J. X. Liu, "Study on Excavation Method of Tunnel with Super Cross-Section and Super Large Section Area Underpass Extra-High Building", Advanced Materials Research, Vols. 250-253, pp. 2057-2067, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Qian Jin Shu, Guang Lin Yuan, Yun Fei Zhang, Guang Li Guo
Abstract:The performance of resisting foundation displacement of a typical single return circuit transmission tower under all kinds of load conditions...
2308
Authors: Zhi Jie Sun, Jun Min Shen, Jian Bin Zhao, Zhong Ming Su
Abstract:Through theoretical calculation, systemic analysis of dynamic performance of the 64m single and double line railway steel truss bridges on...
1100
Authors: Yuan Bo, Wei Min Feng, Mei Qing Liu, Qiu Wei Li
Abstract:Compared RNG and Realizable model with experiment results in numerical simulation in inlet passage,conclusion Realizable k-e model is better...
2485
Authors: Feng Jin, Chao Wan, Hu Ying Liu
Chapter 4: Fluid, Fluid Machinery and Engineering
Abstract:A method approaching mirror boundary condition for smoothed particle hydrodynamics (SPH) method is presented. The virtual particle is...
1043
Authors: Zhi Jie Sun
Chapter 5: Bridge Engineering
Abstract:Through theoretical calculation, systemic analysis of dynamic performance of the 64m single and double line railway steel truss bridges on...
2135