Paper Title:
The Application of Geogrid in Highway Widening Project of Zhangzhou Coastal Main Artery
  Abstract

Associating with highway widening project of Zhangzhou coastal main artery, the numerical analysis is carried out to analyze the lateral displacement, settlement and soil stress distribution of high fill embankment using geogrid. The results show that using geogrid can reduce the settlement and uneven displacement of high fill embankment. The maximum displacement occurs at the intersection position between old and new embankments, especially the geogrid embedding position. After the geogrid is used, vertical settlement significantly reduced while lateral displacement is in the highest flight. The lateral displacement is nearly 6cm and the total displacement is nearly 7cm, and both values are acceptable in filling construction. Meanwhile, the numerical analysis result manifests that the stress distribution of high fill embankment tends to uniform and then the whole stability of embankment increases. These conclusions may be useful to the design and analysis of reinforced-embankment of high fill and interface between new and old embankments in widened embankment.

  Info
Periodical
Advanced Materials Research (Volumes 255-260)
Edited by
Jingying Zhao
Pages
3307-3310
DOI
10.4028/www.scientific.net/AMR.255-260.3307
Citation
Y. W. Meng, H. J. Chai, "The Application of Geogrid in Highway Widening Project of Zhangzhou Coastal Main Artery", Advanced Materials Research, Vols. 255-260, pp. 3307-3310, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jun Du, Zhi Rong Mei, Yong Zhao Chen
Chapter 2: Applied Mechanics, Geo Science, Building, Structural and Civil Engineering
Abstract:With Xiamen Jiaheyuan underground access as the project background, tunnel face stability of soft shallow tunnel was analyzed under the...
170