Paper Title:
Safety Analysis of the Temporary Dam Body of Concrete Faced Rockfill Dam during Construction Period
  Abstract

Concrete faced Rockfill dam (CFRD) is a safe and economical dam type in hydraulic engineering. The temporary dam body for flood control during construction period is usually used for CFRD, so the safety of temporary dam body during construction period is very important. Based on numerical simulation of the seepage field of the temporary dam body of CFRD using nonlinear FEM (Finite Element Method) under the action of flood of the river during construction period, the stability of the dam slope is studied. The effectiveness and applicability of the method introduced is certified through computation in the study on the practical project. The paper provides an effective analysis method for the study on the stability of dam slope of the temporary dam body of CFRD for flood control during construction period.

  Info
Periodical
Advanced Materials Research (Volumes 255-260)
Edited by
Jingying Zhao
Pages
3676-3681
DOI
10.4028/www.scientific.net/AMR.255-260.3676
Citation
X. C. Lu, B. Tian, S. Zhang, "Safety Analysis of the Temporary Dam Body of Concrete Faced Rockfill Dam during Construction Period", Advanced Materials Research, Vols. 255-260, pp. 3676-3681, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Li Hong Chen, Jian Yang, You Ren Yuan, Tao Sun
Abstract:Linear and nonlinear shear strength models of rockfill, and the safety factor criterion of nonlinear shear strength were discussed in this...
2732
Authors: Lin Ke Li, Ai Jun Zhang, Jin Yu Liu, Chun Jiao Hou, Hao Dong Li
Abstract:A new method that 3D numerical simulation combined with anti-cut stability analysis is employed to analyze the stability of Majiabian gravity...
2624
Authors: Chang Chun Wu
Chapter 8: Hydraulic Engineering
Abstract:Through project examples, this paper set up a two-dimensional finite element seepage flow model with the help of the Auto-BANK software, to...
2699
Authors: Jun Yan, Si Hong Liu, Bin Zhou
Chapter 4: Hydraulic Engineering
Abstract:The anti-seepage measures of a high earth rockfill dam built on the foundation with a deep overburden affects the stability and safety of the...
1872
Authors: Shu Qi Ma, Si Jing Cai, Miao Guo
Chapter 3: Geotechnical and Structural Engineering
Abstract:As a major hazard installation in mine the safe and effective running of a tailings dam is very important, therefore the stability analysis...
1406