Paper Title:
Research on the Application of Horizontal Rotation Construction Method with Flat Hinge in Cable-Stayed Bridge Construction
  Abstract

Rotation construction method includes building the bridge parallel to the obstacle being spanned (a river, a highway or a railway) and then rotating the superstructure into place. The method can optimize bridge construction in terms of reducing impacts on traffic, safety, and overall project budget and duration. Therefore, the method became so popular that it has been used successfully in about one-hundred bridges in China. In this paper , taking the Suifenhe cable-stayed Bridge as project background, the design idea (single point with flat hinge) of bearing system has been brought forward. The successful rotation construction of Suifenhe cable-stayed Bridge proved the feasibility and technical advancement of the horizontal rotation construction method with flat hinge in similar engineering construction, especially the bridges with symmetry structure.

  Info
Periodical
Advanced Materials Research (Volumes 255-260)
Edited by
Jingying Zhao
Pages
856-860
DOI
10.4028/www.scientific.net/AMR.255-260.856
Citation
Q. S. Sun, X. G. Guo, D. P. Zhang, X. K. Guan, Y. Zheng, "Research on the Application of Horizontal Rotation Construction Method with Flat Hinge in Cable-Stayed Bridge Construction", Advanced Materials Research, Vols. 255-260, pp. 856-860, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Chao Liu, Dong Xu, Yuan Sun
Abstract:Najin Bridge, located in Lasa of China, is an extradosed bridge with three towers and with the (70+117+117+70)m spans. The turning radius of...
1996
Authors: Jie Jun Wang, Qing Liang Zhu, Xiao Liang Peng
Chapter 9: Bridge Engineering
Abstract:Considering the transformation of the system and the increasing of the load in the construction process of long-span arch bridge, combining...
2273
Authors: Hong Zhang, Yong Tao Zhang, Ren Zhong Zhou
Chapter 16: Advanced Design Technology
Abstract:In Long-span bridge construction by incremental launching method, due to its quiet heavy launching weight, long cantilever and complex...
3299