Design and Optimization of Concrete-Filled Steel Tube Arch Bridge Using Cable-Hoisting Method
  Abstract

Based on the hoisting construction feature of large hinge-support tower and field circumstance, the cable hoisting system for Meng-dong river grand bridge at the west of Hunan province is designed. Studying on cable hoisting system design and construction of the CFST arch bridge, the paper takes systematic analysis and calculations on the key construction technology of the CFST arch bridge, and puts it in practice successfully which provides experience for the similar long—span bridge construction of the follow.

  Info
Periodical
Advanced Materials Research (Volumes 255-260)
Edited by
Jingying Zhao
Pages
896-900
DOI
10.4028/www.scientific.net/AMR.255-260.896
Citation
X. F. Liang, Y. Xu, H. J. Du, "Design and Optimization of Concrete-Filled Steel Tube Arch Bridge Using Cable-Hoisting Method", Advanced Materials Research, Vols. 255-260, pp. 896-900, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Wen Wu Li, Zhe Zhang, Cai Liang Huang
Abstract:A dynamic unstressed length link element and a catenary element are developed based on classical link element and catenary element, and a...
988
Authors: Wen Ping Peng, Zhong Chu Tian, Tian Yong Jiang
Chapter 5: Bridge Engineering
Abstract:The technology of cantilever casting construction was complex for reinforced concrete arch bridges. This paper described key technologies of...
2272
Authors: Yu Wang, Yan Hong Wei, Gui Fen Hu
Chapter 13: Construction Technology
Abstract:Mingzhou bridge in Ningbo is a half-through steel box arch bridge with 450m main-span. The bridge adopts welded steel structures except that...
1403